PAJARI

 INSTRUMENTS LTD

Directional Surveying

Instrumentation and Accessories

Home   |    Sitemap    |    Contact Us


4About Us 4Our Products 4Information Menu 4Survey Trains 4Price Quotes

Tropari


Introduction

Applications

General Information

4English 4Français

Specifications

4English 4Français  

Surveying Methods

Overview

Wireline

Inner Tube Sub

 = Accessories

Landing Coupling

Wireline Surveying Instructions

(picture by picture)

Open Hole

Cable Lowering

 = Accessories

Rod Lowering

Operating Instructions

4English 4Français

Setting Time

4English 4Français

Reading the Results

4English 4Français  

Tropari Help

Parts Catalogue

Shock Damage

Water Damage

Desiccant Container

Checking Sensitivity

Container Maintenance

.




Tropari Wire-line Surveying Instructions


Pull the hitch pin and begin lowering the now assembled 12m (36 foot) survey train.

<< Back

Step 17 of 25

Next >>
.
  • Pull the hitch pin and begin lowering the now assembled 12m (36 foot) survey train.
 

 
© Pajari Instruments Ltd. 2008
sales@pajari.com - www.pajari.com